Cumbrae Service



"Planned maintenance", caused Loch Shira to be off service for most of the day, 20 March 2025. Loch Tarbert was pressed into relief service however, due to the vastly reduced vehicle capacity, there was a 90 minute wait for vehicle transport by 12:45. Of course, this situation was not helped by a minor collision between two vehicles on the car deck on arrival at Largs, together with the broken down car in the queue, resolved by the Maybole "white knight" next in the queue! Summer is here!

Lochinvar



"Back door" Mull ferry Lochinvar called in to Largs en-route to the Garvel 18 March 2025

Loch Fyne



Loch Fyne arrived at 11:30 13 March 2025, from Troon. A return trip to Cumbrae Slip was undertaken and the vessel then tied up with electrical problems. The post-maintenance gremlins strike again!

Loch Portain



Loch Portain at Largs Pier 25 February 2025.

Cumbrae Service



Loch Shira off service due to Souterly gales 21 February 20205. Service resumed at 14:15 after the wind abated somewhat.